PHEDBarmer Lift Water Supply
Project (SPR-I)
Project Overview
Larsen & Toubro Limited – L&T Construction
Mohangarh – Bhagu ka Gaon – Army Base, Jaisalmer
M/s V S Sodha Construction Pvt Ltd
19 Jan 2013 to 31 Aug 2018 (Completed)
Nature of Work
Deployment of highly skilled manpower and comprehensive Operation and Maintenance (O&M) support for the Barmer Lift Water Supply Project with a 172 MLD Plant Capacity, a 32km long MS pipeline (1650mm diameter), and another 17km long pipeline (500mm diameter). The engagement focused on the continuous management of critical water infrastructure, including Water Treatment Plants (WTP), Raw Water Reservoirs (RWR), Clear Water Reservoirs (CWR), and massive pump houses. A major project highlight was the excavation of a massive 750m x 750m Dam, 10 feet deep, resulting in a Total 2,812,500 Cubic Meter volume capacity. Our team ensured 24/7 operational reliability for transmission mains supplying potable water to both civilian populations and strategic Army base locations.
Infrastructure Details
Facilities
WTP, RWR, CWR
Pump Houses
Mohangarh & BKG
Scheme Type
Lift Water Supply
Service
Civic & Army Supply
Detailed Scope of Work
| Work Category | Operational Support Details |
|---|---|
| Dam Execution | Excavation of a 750m x 750m Dam, 10 feet deep, resulting in a total volume capacity of 2,812,500 Cubic Meters. |
| Mechanical O&M | Routine and preventive maintenance of high-capacity pumps, motors, valves, and mechanical actuators within the pump houses and WTP. |
| Electrical & Instrumentation | Management of HT/LT power systems, control panels, telemetry monitoring, and instrumentation systems for real-time flow and pressure tracking. |
| Civil Maintenance | Upkeep of RWR/CWR structures, chemical dosing bays, and facility buildings to ensure longevity and hygiene standards. |
| Manpower Deployment | Deployment of plant operators, electricians, fitters, and unskilled labor for 3-shift operations across all project sites. |
| Safety & Quality Compliance | Regular monitoring of water quality parameters and strict adherence to industrial safety protocols during maintenance activities. |
Excellence Certification
"Certificate of Appreciation for consistent operational support and dedication during the O&M phase of SPR-I Project."
D. Sukumar
Project Manager, L&T Construction
description Technical Relevance for Tenders
- Long-term O&M experience in large-scale Lift Water schemes (5+ Years).
- Proven track record with India's most reputed EPC contractor (L&T Construction).
- Strategic infrastructure support for high-security environments (Army Base supply).
- Expertise in Multi-disciplinary O&M (Mechanical, Electrical & Civil).
Project Site Gallery
Visual documentation of project site and infrastructure.